industrial training report for electrical engineering students

This comment and recommendations are also for Polytechnicstudent who get involved in this internship. 95-108, Mar. Figure 3.2.1 T&C Warmer Unit machine , ATOMWEEK 3 (22 MARCH 2021 29 MARCH 2021)I had attend the PPM with Daya Cerdas for humidifier ventilallator Avea ,vendorwas checking the performance test and EST test. CENTRAL TRANSPORT SHOP and COLONY All the institutions of higher learning in Malaysia that offer Engineering programmes have this requirement in their curriculum. Press the main screen keyto close the menu.Enabling automatic NBP printouts.Open the blood pressure menu and touch the auto print NBP check box to selectthe enable and disable auto print setting. The control are suspect faulty and need to becahnge with the new control box. The main bus 33KV is connected to grid located at Sector-25, INDIRANAGAR, LUCKNOW. Hopefully with the Industrial Training which able to run to enhance the knowledge of students to enable them to contribute more effectively towards national development in the future and to get a job that suits them according to the skills they have learned. A keypad willappear. During training an effort was made to know about 1) Factors considered for establishing new substations 2) Importance of substation earthing 3) Study of operations and maintenance of major substation equipments and 4) Responsibilities of Electrical Engineers in establishing operation and maintenance of substations. I also have update the calibration date and seriel number of equipment had do calibration in BEMS folder. I hope with the implication of the Industrial Training, there will be no more anomalousfeelings when the students started working after they have finished their course later. Ensure the safety of the student on every practical work that is been assigned to them. Do not sell or share my personal information. For instance, perfusion online data system, weighing scalebed (ICU), patient monitor (ICU), Urodynamic Machine, Stress Test System, and HighNasal Flow machine.WEEK 12 ( 24 MAY 2021 26 MAY 2021 )Change the fuse of vital sign 4 at the dialysis centre. SIWESwas established byITFin 1973 to solve the problem of lack of adequate practical skills preparatory for employment in industries by Nigerian graduates of tertiary institutions. So, the exposure that uplifts the knowledge and experience of a student needs to be properly documented in the form of a report. The facility includes. Has a responsibility to settle all financial cost and expenses incurred and due orupon demand. Click here to review the details. Hi, I'm Samuel! The new equipment needs to be testing by the vendor follow the IEC standardand briefing by vendor how to use their equipment. I hope my recommendations will beconsidered and can help student Polytechnic and KPJ Johor also in the future. Students should have completed required elective modules to be better Figure 37: Distribution box detail for TNB concrete pole . Error! JAUNPUR, UTTAR PRADESH AKASH defined. Basaveshwar Engineering College, Bagalkot. The industrial watertube boiler typically produces steam or hot water primarily for industrial process applications, and is used less frequently for heating applications. Karnataka Power Transmission Corporation Limited, Bagalkot Zone, Submitted in partial fulfillment of the requirements for the degree of. Please ensure to check and include the following in the relevant sections of the report. 385.2 COMMENTS AND RECOMMENDATIONSOn this occasion I want to give a little review and suggestion to all who get involvedduring my internship. Relationship of Student with Industrial Based Supervisor, Staff and General Public: On my assumption, I was given a warmth and befitting reception that stimulated and motivated me to bring my best in order to achieve my set objective. Figure 23: Feeder pillar details front view . Error! Highlight of the report: The primary factor to enhance performance and productivity in any firm/organization/industry is training. of Engineering (Hons) Electronic Engineering (EE241) to complete eight weeks of a Training report on 33/11 kV substation CVT measures voltage and steeps down at 110V. The functions of system are used to collect and keep the all dataof asset and this system also can help user to find the details of equipment with moreeasy.I had took the medical check up on date 27hb April 2021 and 30hb April 2021 becauseod feeling unwell.WEEK 9 ( 3 MAY 2021 -8 MAY 2021)Troubleshoot patients bed paramount , the control panel are problem cause thefunction cant be use properly. To learn more, view ourPrivacy Policy. 24CHAPTER 4 TECHNICAL REPORT4.1 INTRODUCTIONDue of Internship: 5 March 2021 until 20 July 2021Technical reports lead to tasks or work that has been performed during trainingindustry. After that, I meet with En . Aided, AICTE NBA Accredited. Bookmark not defined. IN To browse Academia.edu and the wider internet faster and more securely, please take a few seconds toupgrade your browser. After cleaningand disinfecting, check the equipment carefully. KPJ Johor is the first privatehospital in Johor under the KPJ Healthcare Berhad (KPJ) Group of Hospitals, thelargest network of private healthcare providers in Malaysia.KPJ Johor functions as a one-stop diagnostic and therapeutic care centre. BEMS staff will write a condemn letter touser to dispose the equipment with this reason such as age of equipment is more than10 years, the manufacture stops to production of that equipment, manufacture stopsupports for spare part and beyond economic repair (BER). Exposure that was given to me at this firm can provide the picture on a real-life situation,the task and responsibility that would be carried by some people on the field. 8) Use the analog to control the main screen. It helps them to update and master their skills. The drafting, computer aided drawings (CAD), practical works, public relation customer b) Planting teamwork and good relations between workers and employees of an organization. During my stay with the Company, I was involved in filling of the office Documents. -Product owner in MAPIDE software in MAPCS DCS. Do not use alcohol on the patient cables.Cleaning and Disinfection the monitor: Lock the display monitor to avoid any unintended action. Same likesengineer staff worker, them also one of the importance for help medical staff doingwork smoothly to save someones life. I get learned and exploreabout the Plan Preventive Maintenance (PPM) and Performance test for biomedicalinstruments. As a student we also do not have to give up if faced with the difficultiesand always believe that there is various way of solutions to overcome all problems. Students must complete 12 weeks of industrial training to be eligible to graduate. This training affords the students to be expose to both practical and theoretical aspect of what they have learnt in the class room. i) Provide an official report on completion of training 3CHAPTER 2 BACKGROUND OF INDUSTRY TRAINING PLACE2.1 INTRODUCTION 2.1.1 PROFILE COMPANY Figure 2.1.1 KPJ Johor Specialist Hospital BuildingJohor Specialist Hospital Sdn. Additionally, the 25-A-device receptacle allows for testing of thosedevices that need it, so the technician is not limited to only test 15-A equipment.4.2.1.2 ESA 615 FLUKE Figure 4.2.1.2 ESA 615 FLUKEThe ESA615 Electrical Safety Analyzer brings fast and simple automated testing inthe form of a portable analyzer to healthcare technology professionals that performelectrical safety testing on medical equipment both in the field and in facilities.Whether it is simple testing or comprehensive analysis, the ESA615 can do it all. There Under the guidance of Touch the value you want to change, a keypad appears. e) Instill teamwork and good relationships with other employees. Electrical Safe Work Practice. Ms Athirah had bring us to visit the all ward and treatment room at the KPJ JOHOR building. Press the main screen key on the frontpanel to close the menu.Adjusting the pulse rate volume.Open the pulse rate menu and touch the pulse rate tone volume meu item.Touch a number to increase or decrease the volume. Figure 3.17.1 EEG machineWEEK 18 ( 5 JULY 2021 10 JULY 2021)KPJ staff have ABMS training for the ISO 37001: 2016 standard requires anorganization to conduct internal audits to determine the effectives of its ABMS.Leaners who take this course will gain the knowledge and skilss to accurately conductinternal audits againts ISO 37001:2016. During the period of my internship work,I have received generous help from many quarters, which I like to put on record herewith deep gratitude and great pleasure. Throughout this exercise, students can handle a problem with wise through experience that has been through this before. Vendor had do EST test to the tympanometer and had do the performancetest to the tympanometer. Chapter 3 - Lecture notes for Thermofluid, Kinematics - Statics Assignment - Truss, and Pulley system in Equilibrium, Q1, staggering - boleh guna untuk study study laaaaaa supaya pandai, Swinburne University of Technology Malaysia, International Strategic Marketing (MKT304), Bahasa Melayu Kerjaya (Sains dan Teknologi)(Local) (LM2026), Accounting System Analysis and Design (AIS655), Object Oriented Development With Java (CT038_3_2_OODJ), Partnership and Company Law I (UUUK 3053), Partnership and Company Law II (UUUK 3063), Business Organisation & Management (BBDM1023). The paper will provide an overview on the UTP Industrial Internship Programme focussing on its objective and approach, management of the programme, operation and monitoring of progress, assessment method and challenges in running the programme. In addition to this, Polytechnic its necessary to emphasize to the student to doinitial preparation before going to industrial training. Suspect the motor had problem and needs to troubleshoot. Bookmark not defined. Industrial training report Chanaka Sudheera 5.8k views 94 slides CEB Presentation 2073 Chethiya Sathruwan 2.9k views 16 slides Ceylon Electricity Board Wickramarathne GT 6k views 98 slides Report of undergraduate training at ceylon electricity board Kulendran Anujan 1.1k views 54 slides More Related Content Slideshows for you (20) INDUSTRIAL TRAINING REPORT SESSION DECEMBER 2020 NAZATUL IZZAH BINTI ZAMRI 08DEU18F1010INDUSTRIAL TRAINING REPORT BY NAZATUL IZZAH BINTI ZAMRI 08DEU18F1010 KPJ JOHOR SPECIALIST HOSPITAL THIS REPORT BOOK IS SUBMITTED TO ELECTRICAL ENGINEERING DEPARTMENT AS FULFILLING PART OF THE CONDITIONS AWARD DIPLOMA IN ELECTRICAL ENGINEERING (MEDICAL)POLITEKNIK SULTAN SALAHUDDIN ABDUL AZIZ SHAH DECEMBER 2020 iiiiiiAKNOWLEDGEMENTSBismillahirahmanirahim, Assalamualaikum W.B.T Alhamdulillah, Praise be to Allah,Lord of the worlds. They gave me a lot of exposure on the terms ofreference and procedures related to the process of my work. Experience: Over 30 years of exceptionally diverse . Furthermore, in this chapter Iwill give a description of each relevant meaning by means of work, equipment used,type hospital equipment and so on.4.2 PLANED PREVENTIVE MAINTENANCE (PPM)Planned Preventive Maintenance ('PPM') or more usual just simple PlannedMaintenance (PM) or Scheduled Maintenance is any variety of scheduledmaintenance to an object or item of equipment. by the council, Figure 5: Tuan Haji Syed Khairol Anuar bin Syed Abidin, SDK., AMK., BCK, ASK Matriculation Number. Be self . The training began immediately following the completion of the semester 6 or 7 final THIS IS ABOUT MY INDUSTRY TRAINING REPORT.I WANT TO MAKE IT PERFECT. On 28hb EEG machine have land at KPJ Johor for T&C , assist by Ms Aina and MsJuwa. applied for internships in the middle of the current semester. Other than that, I suggest tostudent for choose their internship place as close as they can with house for avoid thecosting during internship. Exposing the IT Students to important facilities that can help them in their field of study. d) Establish and strengthen confidence in the performance of duties. 1961. . Figure 33: Weather proof sticker for lighting pole numbering reference Error! From the5 Mac 2021 until 20 July 2021, I was placed in thissection under the supervisor, En Mohamad Firzi Mukhri bin Ali as a leader whoteach students of Industrial Training for Biomedical Services.For 5 months here I have learned a lot and have been obtained during the trainingperiod in the corrective maintenance and Planned Preventive Maintenance ofbiomedical equipment. Jagged Circle Clean the monitor using the soft cloth with mild soap and water. It owns 38.7% of KPJ,according to data compiled by Bloomberg. REPORT ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEME (SIWES) TRAINING PROGRAMME . It is 90 % smaller and lighter than single- function patient simulators, provides one-tap testing for most patient monitor checks, and runs all day on a single battery charge. placement and while . Right to a health and safe environment.Patient's Responsibility1. This page is usually the first you'll see and have to fill in your logbook. For example, I had attended theT&C of warmer unit of ATOM at HDU ward with Ms Atirah. This is fit with the Polytechnicobjective that is to produce a workforce that are high in quality and partially professional inthis country. Karaj County, Alborz Province, Iran. 4.4.1 Breakdowns Tools Figure 4.4.1 Proskit Electronic Tools Kit4.5 BEYOND ECONOMIC REPAIR (BER)Beyond Economic Repair means the medical equipment are not economical to repair.The medical equipment will be disposed. Figure 3.3.1 PPM of humidifier Ventillator Avea using Rigel analyzer 17WEEK 4 (30 MARCH 2021 3 APRIL 2021)I had attend the breakdown of Paramount patients bed at HDU. As a traineeI was educated for do my duties with honesty and trust because this value will give thequality work of ones work and ones trust in us. Organization Background and Structure .. 1 If they are not aware of new concepts and technology, the industrial training program lets them master the latest advancements. The greenery of the environment must be preserved in developing the area administered Industry training is important because such training can expose students to the real working environment. The Company also offers expertise in allied contracting activities such as electrical, plumbing, fire-fighting and industrial projects, in order to offer turnkey solutions, apart from execution of . -> Basic knowledge of MatLab/simulation of electrical and PLC Scada. Currently, a minimum period of 10 weeks at industry has been made compulsory for all engineering programmes offered at the higher learning institutes. As an Industrial City Weve updated our privacy policy so that we are compliant with changing global privacy regulations and to provide you with insight into the limited ways in which we use your data. A good project report presents your final year project work in brief and very effective. MAINTENCE SER development. akmal. You can read the details below. name : puteri nur sofea binti mohd zakki student id : 2020995295 program : ee2 41 organization : majlis perbandaran sungai petani kedah visiting lecturer : en mohd abdul talib training duration The purpose of this industrial training is a part of course requirement of the Bachelor and COLONY Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma DIESEL LOCOMOTIVE WORKS VARANASI, Summer Training Report. All undergraduate students undertaking a Bachelor of Engineering (Hons), including dual programs, and postgraduate students studying . The Industrial Training was based on working with Personal Computers, servers, printers, laptops . Lastly, student involvement in industrial training like this can prove and furtherstrengthen student's identity in undergoing training in technical field, at the same time makingPolytechnic as practical platform of education. Enter the value in the numeric keypad and touch OK. Press the mainscreen key button to close the menu.Silencing alarm.To silence a continuous alarm for 60 seconds, press the alarm silence key once.For silence a continuous alarm, press alarm silence key once. The Scheme exposes students to industry based skills necessary for a smooth transition from the classroom to the world of work. Both machine are in good condition. For the December 2020 session, thetraining runs for 20 weeks, starting from 5 Mac 2021 until 20 July 2021.I have sought and found a place to undergo industrial training in the BiomedicalServices Department (BEMS). During this period, I was taught installation of electrical fittings in the office. 62.1.4 KPJ JOHOR EMBLEM Figure 2.1.4 Logo KPJ JohorKumpulan Perubatan JohorFrom its inception to the end of 2009, KPJ Healthcare Group (KPJ stands forKumpulan Perubatan Johor), which mainly involved in private hospital care business,was expanding very fast within Malaysia. 1.3 Mission .. Emergency power supply system (or genset). -Engineering Software Analyst & Industrial Automation Engineer in MAPNA Electric & Control Engineering & Manufacturing Co (MECO) MECO is an international company, a technical design And a leading integrator of electrical . Industrial Training and BS Projects Industrial Training Industrial Training Report Preparation Guidelines Required Format The report should be printed on 210 X 297 mm A4 size paper. The vendor had comeand set up the warmer unit and had do the EST (IEC 60601-1) to the warmer unit. EPOC machine are use for enablecomprehensive blood analysis testing at the patients side on a single room. It provides students with some exposure to the actual working life while at the same time allowing them to extend their theoretical knowledge into practice thus enhancing their understanding further. MPSPK facility unit is responsible to provide The programme worth 16-credit hour, which is almost equivalent to a semester academic load and is, called Industrial Internship Programme. DEGEMA LOCAL GOVERNMENT COUNCIL is one of the twenty three {23} local government in rivers state, Nigeria. The 4 week training has exposed us to the actual application This breakdown is my first case attempt bymyself and I had learned and follow the all prosedure like biomed techinician areshowed to me. Indeed, the Company was like family following some of interpersonal relationship with mates, supervisors and staff. Sorting of some products that is needed to be disbatched. TRAINING 2.4. Figure 3.15.1 voltage stabilizer problem 22WEEK 16 ( 21 JUNE 2021 -26 JUNE 2021)Biomed technician had the training system online for ABMA anti bribery managementsystem online. 7) Press the print button to get the result of measurement. Industrial Training Report 2021 Industrial Training Report 2021 University Universiti Teknologi MARA Course Electrical Engineering (EE220) Uploaded by Muhammad Asri Academic year 2020/2021 Helpful? I had do EST test and performance test with biomed techinician for ECGmachine MAC2000 because user are complaint that ECG waveform are not stableduring get the patient ECG result. Currently seeking professional industrial training experience with a reputable company. ICU monitor are bereplaced. When the industrial training students are exposed to a variety of . VEER BAHADUR SINGH PURVANCHAL UNIVERSITY fabric of reality to all the consciousness, for I am truly grateful and felt blessed by His All the parts are be checked based on the checklistand the all function are be test using the analyzer. I had exposed and knowingthe various of imaging medical equipment such as MRI, CT-Scan, x-ray mobile,lithotherapy equipment, physiotherapy equipment, ICU and A&E departmentequipment. Open the fuse casing using the test pen, and replace the new fuse into right place. The bed cant becontrol by using the remote control. It is because as a biomed technician willmeet and communicate with staff at hospital and vendor. Feb 2021 - Jan 20221 year. Students industrial work experience scheme (SIWES) is a programme designed by the industrial training (IT) especially for the training of students in various institutions in order to acquire a commendable skill that is technically oriented and also, knowledge in relation to learning process (jemerigbo,2003) within 1993/1994 (information and guideline for SIWES, 2002) the support of the student industrial work experience scheme (SIWES) unit of the national open university of Nigeria, port-Harcourt study center. A Graduate student in the field of Digital Manufacturing, Systems and Technology from McMaster University, Canada. Pull the loose edge to remove any slack and close the recorder door. Tech in Electrical Engineering in the year 2018 from Kalinga Institute of Industrial Training, Bhubaneswar, and completed Diploma in Electrical Engineering in the year 2015 from Jnan Chandra Ghosh Polytechnic College, Kolkata. Figure 38: Sample of conductors and cable terminators . Error! The Community Service is the provisionof care through our network of Clinic Wakaf An-Nur (KWAN) charity clinics. During industrial training, students can assess their ability to work from employers. Among the biomedical engineers who have done a lotfor me are En. Personally, I would like to thank to Encik Adizul Ahmad for Figure 3.14.1 EPOC machine.WEEK 15 ( 14 JUNE 2021 19 JUNE 2021)Voltage stabilizer MRI are problem, chargeman and CPSM had check the voltagestabilizer using the multimeter. SPOTLightsets up in seconds to send Peripheral capillary oxygen saturation (SpO2), heart rate,perfusion, transmission, artifact noise, and eight different manufactures custom R-curves to a pulse oximeter or patient monitor. I have completed atleast 6 months of inpalnt industrial training period under various division in Electrical Engineering field. By then, the KPJ Group was the largesthealthcare service provider listed on the Bursa Malaysia.Johor Corp is a Malaysian state-owned investment company, is weighing strategicoptions for health-care provider KPJ Healthcare Bhd., according to people withknowledge of the matter.The investment arm of the Johor state government is seeking ideas from potentialadvisers, said the people. ivTABLE CONTENTTITLE PAGESTitle iDeclaration iiPengesahan Tamat Latihan Industri Pelajar iiiAcknowledgments ivTable Content vList Of Tables viList Of Figures viiCHAPTER 1: INTRODUCTION 11.1 Introduction Industry Training 21.2 Objective of Industry Training 31.3 Importance of Industry TrainingCHAPTER 2: BACKGROUND OF INDUSTRIAL TRAINING PLACE 42.1 Introduction 4 5 2.1.1 Profile Company 6 2.1.2 Vision, Mission, Core Values 7 2.1.3 Patients Right & Responsibility 8 2.1.4 KPJ Johor Emblem 8-9 2.1.5 Brand Signature 10 2.1.6 Location 112.2 Organization Chart 112.3 Organization Information 12 2.3.1 Biomedical Organization Structure 122.4 Department Function 13 2.4.1 Head of Services 14 2.4.2 Unit Manager 2.4.3 Medical OfficerCHAPTER 3: SUMMARY OF IDUSTRIAL TRAINING ACTIVITIES 153.1 Introduction 16-243.2 Summary of Industrial Training ActivitiesCHAPTER 4: TECHNICAL SYSTEM 254.1 Introduction 254.2 Planned Preventive Maintenance (PPM) 26-28 26 4.2.1 Specifications Tools for PPM and EST Test 26 4.2.1.1 ESA 620 FLUKE 27 4.2.1.2 ESA 615 FLUKE 27 4.2.1.3 Rigel 2888+ Electrical Safety Analyzer 28 4.2.1.4 ProSim 4 Vital Sign and ECG Simulator 28 4.2.1.5 ProSim 8 Vital Sign and ECG Simulator 29 4.2.1.6 ProSim SPOTLiGHT SPO2 Pulse Oximeter Analyzer 29 294.3 Unplanned Maintenance4.4 Emergency Breakdown 4.4.1 Breakdown Tools Kit vTITLE PAGES4.5 Beyond Economic Repair (BER) 294.6 Testing and Commissioning (T&C) 304.7 Operation of Vital Sign 4 Monitor 30 30 4.7.1 Introduction 31-32 4.7.2 Label of Function 33 4.7.3 Procedure of Vital Sign 4 34 4.7.4 Common Problem of Vital Sign 4 35-36 4.7.5 Planned Preventive Maintenance (PPM) Vital Sign 37 4.7.6 Breakdown Vital Sign 4 38CHAPTER 5: RECOMMENDATIONS AND IMPROVEMENTS 395.1 Findings5.2 Recommendations 40CHAPTER 6: CONCLUSION 416.1 Conclusion 42REFERENCES 43 44APPENDIX 1: PPM RESULT OF GASTROSCOPY 45APPENDIX 2: T&C DOCUMENTS 46APPENDIX 3: MAINTENANCE REQUEST FORM 47APPENDIX 4: WORK PASS APPLICATION FORM 48APPENDIX 5: REQUISITION FORM FOR SERVICE/REPAIRAPPENDIX 6: WORKPLACE MANAGEMENT SYSTEMAPPENDIX 7: ACTIVITIESviLIST OF TABLESTABLE PAGESOrganization chart 10Biomedical organization structure 11Head of Services 12Unit Manager 13Medical Officer 14Label of function of SureSign VS4 Monitor 31-32 viiLIST OF FIGURESFIGURE PAGES2.1.1 KPJ Johor Specialist Hospital Building 52.1.4 Logo KPJ Johor 82.1.6.1 KPJ Johor Specialist Hospital Main Entrance 92.1.6.2 KPJ Johor Maps 103.1 KPJ Johor Outpatients Building 163.1.1 Cot side rail patients bed LKL 173.2.1 T&C warmer unit machine, ATOM 183.3.1 PPM of humidifier Ventilator AVEA using Rigel analyzer 183.4.1 ECG waveform not stable and ECG simulator to calibration 193.5.1 PPM of Laser Therapy machine 193.5.2 PPM of Shockwave therapy machine 203.7.1 Oxygen sensor of GA machine 203.9.1 PPM of Tympanometer 213.10.1 Change the side connecter of warner unit 213.12.1 Fuse changing of VSU monitor 223.14.1 EPOC machine 233.15.1 Voltage Stabilizer problem 233.16.1 Site visit of Linac replacement 244.2.1.1 ESA 620 FLUKE 264.2.1.2 ESA 615 FLUKE 264.2.1.3 Rigel 288+ Electrical Safety Analyzer 274.2.1.4 ProSim 4 Vital Sign and ECG Simulator 274.2.1.5 ProSim 8 Vital Sign and ECG Simulator 284.2.1.6 ProSim SPOTLight Spo2 Pulse Oximeter 284.4.1 Breakdown tools 294.7.1 SureSign VS 4 monitor 304.7.3 Basic Operations of SureSign VS4 monitor 33 viiiCHAPTER 1 INTRODUCTION1.1 INTRODUCTION OF INDUSTRY TRAININGThe industrial training compulsory for every student Diploma in ElectronicEngineering (Medical) as a condition for the award of the diploma.

Conclusion Of Touch Sensor, Osceola County Fair Armbands, Articles I