nyc dot traffic standard drawings

If it is determined to be unfeasible, the pending permit will be rejected. MAY ALSO WORK 7PM TO 11PM WEEK DAYS ONLY FOR THE PURPOSE OF DEP INSPECTION WITH INSPECTOR ON SITE. To request release of an STP hold, the applicant must contact the HIQA borough office in the borough in which the proposed work is to be performed. IF MORE THAN 50% OF THE SIDEWALK FRONTAGE IS AFFECTED THE ENTIRE SIDEWALK MUST BE REPLACED WITH THE NEW 4.13C STANDARD. Listed on the following page are the most commonly requested Street Opening Permit types which may be used when completing an application. Report a problem. Division of Traffic Engineering Brooklyn.Forestry@parks.nyc.gov 280 Broadway, 3rd Floor When a need exists to develop special details similar to the standard details, consultants may request copies of the .dgn files from their NYSDOT Project Managers. Tel: (718) 430-1877, Brooklyn CONTINUED: (II) FIFTEEN FEET OF HYDRANTS (III) A CROSSWALK OR PEDESTRIAN RAMP, NOR SHALL IT BE STORED OR PLACED IN ANY MANNER AS TO OBSTRUCT ANY CROSSWALK OR PEDESTRIAN RAMP. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Links were last checked January 2023. PERMITTEE MAY ALSO OCCUPY ONE TRAVEL LANE ADJACENT TO EAST CURB LANE 830PM TO 4:30AM.NIGHTLY FROM 10/4 THROUGH 10/15. All applications for construction or repair of a transformer vault must be accompanied by an electric utility company layout, and must comply with the minimum clearance requirements for transformer vaults unless an approval or waiver is obtained from the appropriate agency or utility (more information is available in. Permit Management & Construction Control Permit by Mail Applicant should submit this form with the appropriate documentation and waiver request fee. Crane placed on the street for construction activity. Upon inspection, HIQA may issue any of the following: Corrective Action Requests (CARs)are issued to address conditions such as inadequate street restorations, missing or cracked street hardware or street cave-ins. To this end, this chapter discusses existing mechanisms that help inform utility companies and other potentialstreet excavatorsof impending NYC DOT work, including how to access information on NYC DOT's planned capital projects, weekly street resurfacing schedules, "protected street"*information and other data that can help to facilitate effective communication regarding street work. WALKWAY IN ROADWAY MAY BE CLOSED 8AM- 4:30PM MON - FRI OPEN ALL OTHER TIMES. MAINTAIN 1 - 11 FOOT LANE FOR 2 WAY THRU TRAFFIC W/FLAGGERS AT EACH END OF WORK ZONE. Borough Permit OfficesIn-person applications for all other construction-related work can be submitted to the borough office in the borough in which the work is to be performed. If applicable, a permit from the Landmarks Preservation Commission (LPC) for the placement of a canopy in ahistoric district or attached to a landmarked building. A permit is not required to install, repave, reconstruct or repair any sidewalk where the work involves an area of less than 25 square feet, unless the purpose of the work is to remove a violation. THIS SEGMENT IS PARTIALLY DESIGNATED LANDMARK. Contact information pertaining to the release of holds by NYC DOT can be found in Appendix C, NYC DOT Contact Information. Real-Time Traffic Conditions & Cameras. ALL WORK TO MEET OR EXCEED NYC DOT STANDARDS. The purpose of placing a street in protected status is to maintain the integrity of a new street surface. The Bronx SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. For further information, call (212) 839-9435. Upon completion of work, sidewalks must be restored according to Highway Rules, Section 2-09(f)(4) and NYC DOT Standard Highway Specifications. Standard Sheets (US Customary) > Doing Business with NYSDOT - (business-center) > Engineering > CADD Info > Drawings > Standard Sheets (US Customary) US Customary Standard Sheets Standard Sheets are available both in the US Customary units accessible below and in Metric units. Tel: (718) 482-4825. Office hours: Applications accepted, only from 8:00 AM to 11:30 AM; Applicants who are registered as permittees (see Section 3.2) and are registered for on-line permitting can log-in to NYCStreets and request an EAN. WORK INCLUDES: CURB/SIDEWALK REPAIR AS NEEDED; ROADWAY MILLING/REPAIR AND RESURFACING; REMOVAL OF CENTER MEDIAN; RESETTING UTILITY OPENING; REMOVAL/REINSTALLATION OF TRAFFIC SIGNALS INCLUDING CONDUIT; INSTALLATION OF PAVEMENT MARKINGS AND PARKING SIGNAGE. Street lights and signals at corners must be sited so that they do not obstruct pedestrian ramps, ensuring sufficient access to the sidewalk for all pedestrians, including those using mobility devices. New York, NY 10038 CONTRACTOR MAY CONTAIN A MAXIMUM OF 25 LINEAR FEET, 8 FEET ADJACENT TO THE CURB DURING NON-WORK HOURS. THE VMS BOARD MUST STATE THE STREET TO BE CLOSED AND THE DATES AND TIMES OF SUCH CLOSURE. NYC DOT's concrete repair schedule for roadways, sidewalks and other assets in the street can also be accessed from this link. SIGNS MUST BE POSTED AT WORK ZONES AS WELL AS BOTH INTERSECTIONS OF AFFECTED SIDEWALK. CPO holds will typically be released by DDC if the proposed work does not interfere with its schedule. Street Opening Permits are required for excavations or other work in a city street that disturbs the street surface. If the request is approved or modified, then all conditions, restrictions, fees and application procedures for obtaining a construction-related permit apply. Existing foundations at traffic signal locations in certain flood-vulnerable areas are being replaced with coastal storm foundations that incorporate a square concrete pedestal raising the electrical components above some flood depths. A collection of manuals, specifications, and other publications relevant to the Office of Traffic Operations. HIQA will determine whether an inspection of the work site is warranted to establish existing conditions before work begins. It draws from a wide range of resources and experience to present a coherent set of choices for street design. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. If any proposed work is within 100 feet of a bridge or structure, applicants must submit a scaled drawing showing the work and exact location. Brooklyn, NY 11241-0103 Share long-term capital plans for planned repairs, upgrades and new Download about 619-011: Work Zone Traffic Control General Tables & Legend; General Information 619-012: Sign Table Keywords: Sign, Table. An explanation and description of "Holds" may be found in Section 3.5 Other Provisions Pertaining to Permits of this chapter. VARIANCE GRANTED TO WORK DURING SCHOOL HOURS AS STIPULATED BY O.C.M.C. Outlined below are the basic application procedures for Sidewalk Construction Permits. If this is not possible, sketches or drawings must be submitted, in duplicate, showing the proposed method of treatment to NYC DOT for approval. At that point, OCMC executive staff will determine if additional permit stipulations are required. New York City Department of Transportation Regular Input and Attendance of Decision Makers at Coordination THE SIGNS SHOULD BE POSTED ON ALL POLES AND DRIVE RAILS ON THE SEGMENT AFFECTED INDICATING THE DATE OF THE CHANGE, THE NEW REGULATIONS AND A TELEPHONE NUMBER TO OBTAIN INFORMATION. OR PUBLIC PARK WRITTEN APPROVAL FROM CITY OF NEW YORK PARKS AND RECREATION IS REQUIRED. ON WEEKDAYS FROM 6AM TO 7PM MUST WORK BEHIND BARRIER WHILE MAINTAINING HALF SIDEWALK (MIN 5 FEET) FOR PEDESTRIANS AND NO USE OF ROADWAY. Moreover, the Third Edition is available onlineto increase the reach and accessibility of this essential reference document. SUCH SIGNS SHALL BE ORANGE,3'X3',DIAMOND SHAPE,WITH 4" BLACK LETTERING. VARIANCE GRANTED TO WORK DURING THE"HOLIDAY" EMBARGO-NOVEMBER TO JANUARY, AS STIPULATED BY THE OCMC OFFICE. EAU will process the request and fax or call the applicant with an Emergency Street Opening Permit Number, which authorizes the emergency street opening/excavation work. For hearings, Monday to Friday from 8:30 AM to 3:30 PM. At the HIQA borough office, applicants will be given a Canopy Authorization Application (. New York, New York 10041. FOUR SPEED REDUCERS ARE LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA.PRIOR TO BEGINING ANY WORK,TO ENSURE THAT YOU RESTORE IN-KIND, YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. MAY STORE TOOL CART IN PARKING LANE DURING NON-WORKING HOURS. A separate permit is required for each street opening activity. Raising the base of the traffic signals or street light poles reduces the chance that the electrical components of the poles will be submerged in salt water during future flooding events. Check all types of work that will be performed by the applicant or his/her corporation. See the state links below for available standard drawings. When utility company representatives mark a location, they use colored flags and/or paint to identify the type of underground service: Streets can hide a complex infrastructure of underground utilities. HIQA performs inspections during active construction. Tel: (718) 482-4516 Bronx, NY 10457 Tel: 718-556-7240 Long Island City, NY 11101 FULL WIDTH OF SIDEWALK SHALL BE OPENED TO PEDESTRIANS WHEN SITE IS UNATTENDED EXCEPT FOR CONCRETE CURING WHEN THAT PORTION OF THE SIDEWALK MAY REMAIN CLOSED PROVIDED ALL OTHER STIPULATIONS ON THIS PERMIT ARE COMPLIED WITH. OCCUPY 12 FOOT WIDTH OF ROADWAY; FULL WIDTH OF ROADWAY RESTORED TO TRAFFIC WHEN SITE IS UNATTENDED. POSITIONING OF TRAFFIC SIGNS (TOTAL OF . The Department of Transportation (DOT) maintains and installs New York City parking regulation signs. New York, NY 10007 Following are the steps for permit application, review and issuance at the central Permit Office: Applications for all other construction-related work, including work on critical streets in Staten Island, can be submitted to the borough office in the borough in which the work is to be performed. BEVELED SAWCUT IN ROADWAY. Attn: Forestry DOT Street Lighting's Standard Drawings Book [PDF] includes Standard drawings for elements in the lighting catalogue. ANY STORAGE OF MATERIAL OR STORAGE OF EQUIPMENT REQUIRES A SEPARATE PERMIT. Brooklyn, NY 11202 RESTORE PAVEMENT AFTER SUFFICIENT TIME FOR CURING. FULL WIDTH OF SIDEWALK AND ROADWAY MUST BE RESTORED AFTER WORKING HOURS. While the files are presented here in .pdf format, the source drawings are actually produced as MicroStation .dgn files. Fax: (718) 430-4663 NJDOT Engineering Department of Transportation Engineering The Engineering area contains most of the reference material needed to design and construct a Capital Program project. The Street Works Manual is a tool intended to increase the performance of both city government and the private sector in this regard. ALL OVERDIMENSIONAL CRANE/TRAILERS REQUIRE AN ADDITIONAL PERMIT FROM THE NEW YORK CITY DEPARTMENT OF TRANSPORTATION DIVISION OF BRIDGES. RESTORATION MUST BE FULL DEPTH CONCRETE AS PER FIRST AVE SPEC,1042A,B & 1050. (212) 839-2410 WORK NIGHTLY 9 PM - 6 AM SUNDAY NIGHT TO FRIDAY MORNING AND 9 PM FRIDAY TO 6 AM SUNDAY. Long Island City, NY 11101 SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. The hold is to review the proposed work and set conditions for the work and/or the street restoration. NOTARIZE THE FORM. Building Operations/Construction Activity Permits apply to construction activities that take place within the street and are generally associated with construction work adjacent to the street. WORK BEING PERFORMED IS FOR EMERGENCY SIDEWALK REPAIRS DUE TO TORNADOS. PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE OPERATION OF THE STATION. Registration applications should be printed on 8 1/2"x 14" paper. 55 Water Street, Concourse Level THIS STIP IS USED WHEN MORE THAN 50% OF THE INTERSECTION HAS BEEN EXCAVATED OR IF WORK CROSSES THE MIDDLE OF THE INTERSECTION. Typically, a valid permit issued by the New York City Department of Buildings (DOB) is required prior to application for permits in this category. ONE ADDITIONAL LANE ADJACENT TO THE ENCLOSED WORK ZONE MAY OCCUR 12:01 AM - 5 AM NIGHTLY WITH NO NOISE OPERATIONS. CTDOT_Traffic . Office hours: 8:30 AM-4:30 PM, Queens Unauthorized removal of muni-meters is prohibited. Additional requirements are contained in Sections 2-02 and 2-09 of the Highway Rulesand should be consulted before any work is performed on the street. Listed in the table are the most commonly requested Sidewalk Construction Permit types, which may be used when completing an application. Capital Project In-House (CPI) hold A CPI hold is automatically placed if the proposed permit location involves a street that will be resurfaced by a NYC DOT in-house resurfacing operation in the near future. Markets, public art, performances, and other events support a vital public realm, increasing pedestrian activity;supporting local businesses;connecting residents with resources;celebrating community, culture, and diversity;and encouraging local ownership of the public spaces in which they occur. In calendar year 2018 NYC DOT processed more than 700,000 construction permits. Tel: (718) 965-7750, Manhattan NYC DOT may revoke a permit without affording the permittee an opportunity to be heard prior to the revocation if NYC DOT determines that an imminent peril to life or property exists. PRIOR TO BEGINING ANY WORK, TO ENSURE THAT YOU RESTORE THE AREA IN-KIND, YOU MUST CONTACT THE NYCDOT RED LIGHT CAMERA UNIT TO OBTAIN THE CONSTRUCTION AND MARKINGS PLANS FOR THIS WORK AREA. All other times - (718) 433-3340, From 7:00 AM to 3:30 PM, Monday to Friday: (212) 839-9697/99 or 9688 NORMAL LL14 RESTORATION IS REQUIRED. View information on how to navigate and use NYCityMap. Standard Drawings are not currently available for download from the shaded states. InspectionsAll work performed in the street is subject to inspection by the HIQA unit. MUST BE AN UNRESTRICTED PARKING LANE. The canopy maintenance permit is from the "07" Canopy Permit series; the specific permit type to be applied for depends on the land use to which the canopy is being attached. The screen image below displays the "NYC DOT 10 year Capital Plan" projects in green and protected streets in blue. ALL PERMITS MUST BE ON SITE. State Standard Drawings See the state links below for available standard drawings. Office hours: 8:30 AM-3:30 PM. THE PERMITTEE MUST HAVE APPROVAL FROM NYCDOT STREET LIGHTING FOR INSTALLATION/REPLACEMENT OF POLES. View the most recent version of Drawing #H1029 of the NYC DOT. See Section 3.5.1 Holds for more information. WALKWAY IN CLOSED LANE. Brooklyn, NY 11201 WORK HOURS ARE 7 AM - 8 PM MON-FRI AND 9 AM - 6 PM SAT. These include major construction related projects or planned traffic enhancements (e.g., Second Avenue subway, bus rapid transit, water tunnel route), or where there are significant traffic issues (e.g., thru streets, exits and entrances to major tunnels and bridges). RESTORATION OF ROADWAY WHICH HAS RED COLORED BUS LANE MARKING MUST BE RESTORED AS FOLLOWS: FOUR COATS OF TERACOTTA #103856 RIDE-A-WAY COATING MATER'L MFG'D BY INTERGRATED PAVING CONCEPTS INC OR EQUIVALENT. A dismissal inspection is always required to close out a violation. These forms may also be found inAppendix B, Forms. COMPLY WITH DOT STANDARD #H1042C. WORK CROSSING THE ROADWAY CAN NOT EXTEND MORE THAN 11 FEET AT A TIME. This New York 811 marking shows where a cable television line is located beneath the sidewalk. From a block party, which opens a single block to community activities for a day, to Summer Streets, which dedicates over 7 miles of streets to pedestrians, runners, and cyclists, programming reminds New Yorkers that streets are public space, and should support active, healthy, and sustainable lifestyles. The permittee must attach a copy of the original permit to the application when requesting a re-issuance and all applicable reviews and fees will apply. NO EXCAVATION OR NOISY OPERATION PERMITTED DURING THIS TIME PERIOD. BACKFILL OR PLATE BEFORE PROCEEDING. A street is considered to be protected for five years from the date it was last resurfaced or reconstructed. Building Operations/Construction Activity Permits are designated as the "02" permit series, meaning all permits in this category begin with "02". Further information is available in Section 2-02 (h) of the Highway Rules. THIS PERMIT INCLUDES THE OCCUPANCY OF THE ROADWAY AND OR SIDEWALK BY BARRIERS FOR THE PURPOSE OF SAFETY AND PROTECTION SURROUNDING THE OPEN UTILITY COVER WHILE MAINTAINING A SHUNT. ALL WORK SHALL ALSO BE COORDINATED WITH ALL OTHER ONGOING CONSTRUCTION IN THE AREA.

Food Stamp Eligibility Calculator, Giant Middle Finger Sign, Investigation Discovery Actors, The Ledges Huntsville Membership Cost, Where Is The Expiration Date On Thomas Bagels, Articles N